Project overview
Rehabilitation Built Around the Actual Condition of the Elevators
Tondo Medical Center required rehabilitation works for three existing elevators consisting of two passenger elevators and one service/cargo elevator.
The project involved more than cosmetic refurbishment.
Inspection and site conditions identified several areas requiring attention, including water entering the elevator shaft and accumulating in the elevator pits during heavy rain, worn or defective electrical and mechanical components, aging backup batteries, damaged or deteriorated fixtures, ventilation components and cabin finishes.
Rather than treating these concerns individually, ElevPh Builders Corporation carried out a coordinated rehabilitation scope addressing the elevator pits, selected operating components and the passenger-facing condition of the elevators.
The objective was to restore the affected systems and finishes while retaining the existing elevator installation where appropriate.








